Oracle database migrations have a reputation for being slow, risky and expensive. Teams spend weeks writing runbooks, scripting change data capture, babysitting Data Pump jobs and reconciling row counts by hand. One missed step, such as a stale capture process or a replication start point that is out by a few transactions, can mean duplicated data, missing data or a failed cutover.
SkyliftAI MigDB for Oracle changes that. Working with AWS Transform, it turns an Oracle to Amazon RDS for Oracle migration into a guided, conversational workflow: you describe what you want in plain English, the AI agent does the heavy lifting, and your team approves and validates each stage.
What is SkyliftAI MigDB for Oracle?
SkyliftAI MigDB is a migration engine for Oracle that handles the work real migrations depend on: secure database connections, supplemental logging, change data capture (Integrated Extract), the Data Pump initial load and change apply (Parallel Replicat).
AWS Transform supplies the conversational agent and the job workspace. A dedicated job type, Oracle to RDS for Oracle (MigDB), connects the AWS Transform agent to the MigDB portal through a secure connector. The agent then runs MigDB actions on your behalf, and an orchestrator agent on Amazon Bedrock AgentCore Runtime coordinates the process.
The result is AI-driven, human-validated migration (HITL): automation does the repetitive work, and people stay in control of every decision that matters.
How it works: four simple stages
- Connect securely. Create a job in AWS Transform, add the MigDB portal connector and supply your database secret ARNs. An AWS account administrator approves the connector once.
- Plan in plain English. Ask the agent to generate a migration plan. It discovers your source databases, checks the environment and returns a six-phase plan.
- Execute phase by phase. The agent enables logging, starts change capture, runs the initial load and starts replication. You validate each phase before it continues.
- Validate and hand over. Row, object and constraint counts are compared, process status is confirmed, and a final status report supports cutover sign-off.
Key features at a glance
Conversational orchestration
Run an end-to-end Oracle migration with a short sequence of plain-English prompts, such as "Generate a migration plan" and "Proceed with Phase 4".
Near-zero-downtime migration
Change capture starts before the initial load. Data Pump exports a consistent snapshot at a flashback SCN, and the Parallel Replicat applies only the changes made after it, so the source stays online throughout.
Secure by design
No credentials are typed into the chat. MigDB REST API and database credentials stay in AWS Secrets Manager and are read by ARN, and MigDB connects through Secure Vault aliases.
Built-in validation
Exported and imported row counts are shown side by side for every table, import errors are classified by impact, and object and constraint comparisons confirm that the target matches the source.
Human-in-the-loop control
Connector approval, migration inputs, phase-by-phase checks, error review and cutover readiness all stay with your team.
Full visibility
Every action the agent takes can be confirmed in the SkyliftAI MigDB portal: process status, parameter files, logs, flashback SCN and row-count summaries.
Repeatable runbook
The same prompt sequence and planning sheet can be reused across schemas, databases and migration waves.
Shorter migration timelines
Much of a traditional migration timeline is manual effort: preparing scripts, running checks, monitoring jobs and chasing status. MigDB automates these steps:
- environment validation and cleanup of stale processes
- supplemental logging and schema-level trandata
- registering, adding and starting the Integrated Extract
- Data Pump export, dump file transfer and import, with continuous monitoring
- creating, positioning and starting the Parallel Replicat
- status reporting across Manager, Extract and Replicat
In a reference run, the full initial load of a 5 GB dump file finished in about 10.5 minutes: the export took 2 minutes 7 seconds, the transfer 17.5 seconds at 132 MB/s, and the import 8 minutes 11 seconds with 5 parallel workers. Change data capture then kept the target in sync with zero seconds of lag.
Timings depend on data volume and environment, but the pattern is clear: work that used to need days of specialist effort now runs from a guided conversation.
Accuracy you can prove
Speed only matters if the data is right. MigDB builds accuracy into the process:
- Correct order of operations. Capture starts first, the export is consistent at the flashback SCN, and replication starts immediately after it, so there are no gaps and no duplicates.
- Safety gates. The agent checks that the import has COMPLETED before it creates the Replicat.
- Evidence, not assumptions. Row counts, object counts, constraint counts and process lag give you documented proof that the migration is complete before you cut over.
Who is it for?
SkyliftAI MigDB for Oracle is built for every role involved in an Oracle migration:
