Customer Case Study  |  Oracle Database Migration

IM INGENIERIA migrates a 128-schema Oracle 19c estate to Amazon RDS for Oracle with SkyliftAI MigDB

On-premises Oracle database migration to Amazon RDS for Oracle: validating a complex 128-schema workload with SkyliftAI MigDB initial load and Change Data Capture.

MigDB for Oracle Amazon RDS for Oracle Change Data Capture AWS
Talk to a migration expert
128Application schemas validated
19cOracle source database on Amazon EC2
10 TBTotal database size
CDCContinuous replication to Amazon RDS

Executive OverviewA managed-platform path for a complex Oracle estate

IM INGENIERIA worked with AWS, Nubosoft and SkyliftAI to assess the migration of its Oracle 19c database from a self-managed Amazon EC2 environment to Amazon RDS for Oracle. The estate included 128 application schemas with extensive dependencies, making both the initial data movement and ongoing synchronisation important areas of validation.

Using SkyliftAI MigDB, the team completed the agreed schema migration, resolved RDS-specific import and compatibility issues, and established functioning Change Data Capture (CDC). The customer subsequently confirmed successful completion of the database migration and expressed satisfaction with the outcome, providing a sound basis for production migration planning.

1. Customer Objectives and Migration ChallengesProving readiness before production

IM INGENIERIA wanted to validate whether its multi-schema Oracle application could move from a self-managed database on EC2 to the managed Amazon RDS platform without losing the relationships, permissions and operational behaviours on which the application depends. The database migration was designed to uncover migration risks before a production transition.

Business and Technical Objectives

  • Confirm that all 128 application schemas and their required objects could be migrated to Amazon RDS for Oracle.
  • Preserve application relationships, roles, grants, quotas and specialist database components.
  • Establish CDC so changes made in the source could be captured and applied after the initial load.
  • Validate the migration through database checks and customer application testing.
  • Develop a repeatable migration approach for a potential future production rollout.

Complexities Identified

Interconnected schemas

Foreign keys, cross-schema objects, roles and grants created sequencing and dependency risks.

Large migration scope

Configuring and managing a single capture workflow for 128 schemas required an approach beyond routine portal-based selection.

RDS administrative model

Some source-side privileges and SYSTEM-owned objects could not be carried across without adaptation.

Data Pump dependencies

Splitting the initial load into separate schema batches created issues with objects referenced across those batches.

Specialised objects

Oracle Text indexes, custom roles and quota allocations required focused validation and remediation.

DELIVERY PRINCIPLE

The POC assessed the complete application workload rather than treating 128 schemas as independent migrations. That distinction shaped the decision to consolidate the initial-load process and validate dependencies together.

Why This Validation Mattered

A successful schema import alone would not have demonstrated application readiness. This migration therefore considered object ownership, security privileges, referential relationships and ongoing transactional changes alongside the movement of table data.

2. Solution and Migration ApproachOne consolidated load, one integrated Extract

SkyliftAI MigDB was used to coordinate environment preparation, bulk data movement and CDC between the Oracle 19c source on Amazon EC2 and the Amazon RDS target. AWS services, including Amazon EFS, supported the staging and transfer requirements for the initial load.

Figure 1 – Migration architecture: SkyliftAI MigDB initial-load and CDC paths from Oracle 19c on Amazon EC2 to Amazon RDS for Oracle

Logical Migration Paths

Initial load

  1. Oracle 19c on EC2
  2. MigDB export
  3. Amazon EFS staging
  4. Amazon RDS for Oracle

Continuous synchronisation

  1. Source changes
  2. Integrated Extract / CDC trail files
  3. Replicat
  4. Amazon RDS for Oracle

Delivery Approach for the Database Migration

Figure 2 – Five-phase delivery approach
1

Phase 1 – Environment readiness

The MigDB Agent was deployed and configured. The team established source and target connectivity, validated Oracle prerequisites, integrated Amazon EFS and prepared the target database and application tablespaces.

2

Phase 2 – CDC configuration

Schema-level supplemental logging was enabled and a single integrated Extract was configured for all 128 schemas. MigDB REST APIs supported efficient configuration at this scale, and CDC storage capacity was increased to accommodate capture operations.

3

Phase 3 – Initial-load redesign

The team initially assessed multiple schema-grouped Data Pump jobs. Because inter-schema dependencies complicated separate batches, the approach was consolidated into one initial-load workflow covering the full set of 128 schemas.

4

Phase 4 – Import orchestration

MigDB export and import activities used shared EFS staging and parallel execution. MigDB APIs were used to support import orchestration, while the team addressed application objects and RDS-specific import restrictions.

5

Phase 5 – Replication and acceptance

Extract and Replicat were configured and started successfully. The team validated schema mappings, replication behaviour and migrated application components before the customer confirmed POC completion.

ARCHITECTURE DECISION

Using one integrated Extract and one consolidated initial-load workflow aligned the migration sequence with the application's extensive cross-schema dependencies.

Validation Approach

The team reviewed import outcomes, the presence of dependent database objects, the creation of schema mappings and the operational status of Extract and Replicat. These checks were complemented by customer application testing ahead of final acceptance.

3. Technical Challenges AddressedSix issues found, six issues resolved

The test database migration surfaced issues typical of a complex Oracle estate moving into a managed database service. Each issue was assessed and addressed within the migration workflow, allowing the team to complete validation without reducing the agreed scope.

Figure 3 – Six technical challenges and how each was resolved
ChallengeResolution and outcome
Cross-schema dependenciesReviewed references between schemas, including keys, object grants and roles. The initial load was consolidated, and dependent artifacts were recreated or validated on the RDS target.
Tablespace quotasInvestigated ORA-01950 and related ORA-39112 import errors. Required tablespace quotas were reviewed and assigned before affected imports were continued.
RDS privilege restrictionsAdapted objects and privileges that depended on self-managed Oracle administration, including certain SYSTEM-owned indexes, using application-owned structures compatible with RDS.
Oracle Text and metadataRecreated and checked Oracle Text indexes, custom roles, cross-schema ownership and required privileges as part of application compatibility validation.
Large-scale Extract setupUsed MigDB REST APIs to configure the integrated Extract for 128 schemas when portal-based schema selection was not practical at that scale.
Replicat validationConfirmed Replicat creation, generated schema mappings, successful process startup and ongoing Oracle-to-RDS replication.

Technical Validation Completed

  • All 128 schemas were included in the completed migration and import-validation activities.
  • Required application dependencies, roles, privileges and specialist objects were reviewed and addressed.
  • Extract and Replicat were operational, with the continuous replication workflow functioning as expected.
  • Customer application testing supported the final acceptance.

Lessons Carried Forward

The engagement reinforced the importance of assessing inter-schema dependencies at the beginning of migration design, translating source privileges into the RDS security model, and using API-based orchestration when a migration scope exceeds practical user-interface limits.

4. Results, Customer Acceptance and Business ValueValidated, accepted and ready for production planning

The test database migration met its principal objective: demonstrating that IM INGENIERIA's complex Oracle application estate could be migrated from Amazon EC2 to Amazon RDS for Oracle using SkyliftAI MigDB, with initial data loading and ongoing CDC operating together.

Figure 4 – Verified outcomes, customer acceptance and business value

Verified Database Migration Outcomes

Validation areaOutcomeStatus
Application schemas128 schemas migrated and included in validation.✓ Achieved
Initial data loadCompleted successfully, with import and dependency remediation.✓ Achieved
CDC / integrated ExtractConfigured and operational across the agreed schema scope.✓ Achieved
ReplicatCreated, mapped and started successfully.✓ Achieved
Oracle-to-RDS synchronisationOperational during test database migration.✓ Achieved
Customer acceptanceTest database migration completion acknowledged and positively received by the customer.✓ Achieved

Customer Validation and Sign-off

Following technical remediation and application testing, the customer acknowledged that the original objectives had been achieved and confirmed satisfaction with the migration results. This sign-off concluded the proof-of-concept engagement and supported progression to production planning.

Business Value Demonstrated

1

Lower-risk decision-making

Testing the complete application scope exposed dependencies and managed-service differences before production migration.

2

Repeatable delivery

Consolidated initial-load orchestration and API-assisted CDC configuration established a practical methodology for similar large-schema migrations.

3

Managed-platform readiness

The database migration has demonstrated a path from self-managed Oracle on EC2 to Amazon RDS, with the potential to simplify routine database infrastructure operations after production adoption.

CONCLUSION

The successful IM INGENIERIA database migration demonstrated the ability of SkyliftAI MigDB to migrate a complex, 128-schema Oracle environment to Amazon RDS for Oracle while maintaining continuous replication. By addressing schema dependencies, quota constraints, privileges and specialised objects, the delivery team established a validated migration process and secured customer acceptance.

Planning an Oracle move to Amazon RDS?

See how SkyliftAI MigDB handles large, interdependent schema estates with consolidated initial loads and continuous CDC replication.